产品类别

更多>>

联系方式

联系人:13829233709 佘昌红
电话:0769-82279781-810
       0769-82279779-810
传真:0769-82279781
邮箱:dg-hongrong@163.com
网站:www.dg-hongrong.com
地址:广东省东莞市沙田镇明珠大
道229号

文章内容

当前位置:首页 - 文章内容

Stranded workers what to do preparatory work before driving?

点击:2880 时间:2010/12/22 字体大小:14px 12px
A:
(1) Check whether the various parts of the normal wire machines, running parts of it obstructions;
(2) Check the electrical and mechanical equipment, electrical switches, the insurance hurdle is normal;
(3) Check whether it is normal to the welding machine;
(4) inspection tools, measuring tools are complete; (5) According to the dispatching orders, process card required matching dies, take the tooth pitch wheel replacement, replacement cutter to measure the diameter and so on.
上一篇:绞合导电线芯的质量要求有哪些? 下一篇:没有了